top of page
WhatsApp Image 2024-02-08 at 09.27.54.jpeg

Double Span Portal Frame with Office Space, Wellingborough

  • Apr 22
  • 1 min read

This project included a double span portal frame with office space at one end. The weather hasn’t always been on our side, but progress hasn’t stopped. This double span portal frame with a mezzanine floor complete with the concrete lift shaft and concrete stairs now in place. The team continued to push on, keeping the site moving and standards high. A big well done to all the lads on site for keeping things moving and delivering to plan.


 
 
 

Comments


DB Favicon.png
bottom of page