St Andrew’s new school project was helped by the sunshine on site and the progression of the steel frame erection.


Alongside the main structural steelwork, was the installation of the lift shaft, concrete stair package, and preparation for the metal decking works.

Projects like this rely on precision from the ground up, ensuring every section is accurately positioned and aligned to keep the build moving safely and efficiently. Great teamwork on site from everyone involved to keep the programme progressing smoothly.


 
 
 